Bishop Kenny High School recently issued the following announcement.
We are excited to share the Phase 1 renovations to the 100-building. Kasper Architects and Auld & White Constructors, LLC. were on the BK campus all summer making sure
everything was in place for the start of school. The design changes made to the classrooms and hallways are a springboard into the future for the 100-building.
Each classroom is equipped with access control, a dedicated wireless access point, dimmable LED lighting, high efficiency HVAC units with fresh air intakes, node desks, and 75”
Promethean touchscreen boards. As the 2021-2022 school year begins, we hope these changes will provide the most up-to-date tools necessary for teachers and students to
enhance the overall classroom experience at Bishop Kenny.
Original source can be found here.